Home    Employment    Equipment    Links    Contact Information      

Figure 1

Figure 2

Figure 3

Topography Map

Computer Aided Drafting

GPS Field

  1. Get in contact with grower.
    • Talk about the type of project.
    • Find the location of the project- ie. County, Township, Section, and Quarter.
  2. Prepare.
    • Aerial Photos. (Figure 2)
    • Soils maps.
  3. Preliminary Survey.
    • Find:
      • Outlet
      • Low Areas
      • Ridges
      • Grade
  4. Initial Proposal.
    • Design a plan from our Preliminary Survey.
    • Present the plan and proposal.
  5. Extensive Survey.
    • Get the Topography. (Figure 1)
    • Ensure Grade.
  6. Finalize Proposal.
    • Sign Contract.
    • Designate approximate date of installation.
  7. Prepare Field.
    • Layout & Flagging.
    • Install Lift Stations.
  8. Installation.
    • Start at Outlet.
    • Install Main Lines.
    • Install Laterals.
    • GPS Main Lines & Laterals (Figure 3)
  9. Clean Up
    • We pick up our flags.
    • Clean up around outlets and lift stations.
    • Bury rocks and debris.

Copyright © 2003 Field Drainage, Inc. All rights reserved.